Maccabit East (completion of highway link)
Client: Israel Roads Company Ltd. as contractor for Hasharon Diggers Ltd.
Project description:
The goal of the project was to turn the segment of Route 471 from the Gat Rimon Interchange to the Sha’ariya Interchange into an urban highway.
The project involved:
1. The Zerubavel Bridge (Gat Rimon), 63 m long and 32 m wide.
2. Sha’ariya Bridge with three exits, total length of 96 m and width of 61 m.
3. Kish Bridge – pedestrian overpass.
4. Acoustic walls.
5. Retaining walls.
6. Drainage ditches.
7. Signage supports.
8. Compliance with Jewish ritual law.
9. Load bearing walls.
Date of execution: August 2010-May 2013