of the Trans-Israel Highway

Client: Trans-Israel Highway Company Ltd.

Project description:

The project involved the construction of four bridges (Bridge 88 at Lakiya; Bridge 134 at Lehavim; Bridge 162 for train; Bridge 170 on Route 40 over Route 6) at Segment 21/2, between Route 40 in the west and Route 60 in the east. Three of the bridges were constructed of prefabricated prestressed beams, whereas the fourth was a pavement plate with projections cast in place with post tension.

Date of execution: December 2011-October 2013